Project: Suspended Jetty Piles, Thevenard Off-Loading Facility.
Ceduna South Australia.
Pipe: 508od x 15.90mm wall steel pipes, spliced to 18m long and coated.
Spliced in-house to AS1554.1 SP by Surepipe NSW.